Request a Quote

Bulk Engineering Procurement & Specification Costing

Submit your steel grades, dimensional tolerances, quantities, and destination port. Our metallurgical and export team will issue a formal quotation with sample MTC and packaging plans within 2 hours.

Procurement & Export Clarifications (FAQ)

Q

What is your MOQ and do you support LCL consolidation?

A

Standard MOQ varies by product (e.g., 5 tons for coils, 1 ton for pipes). We support LCL mixed container loading from Qingdao/Tianjin ports for trial orders.

Q

How fast can I get a quote, and what is the typical lead time?

A

Standard specifications are quoted within 2 hours. Production takes 15–30 days, backed by real-time steel mill tracking and logistics milestones.

Q

What certificates do you provide, and is SGS inspection allowed?

A

We supply EN 10204 3.1 Mill Test Certificates (MTC) with every batch. 100% support for SGS, TÜV, or other third-party inspections before loading.

Q

What payment terms do you accept, and where do you ship from?

A

We accept T/T (30% deposit + 70% balance against BL copy) and L/C at sight. Main shipping ports are Qingdao Port and Tianjin Port.

Our Quotation & Verification Commitment

  • 100% verification of mechanical/chemical property specs by metallurgical engineers
  • Direct mill quota allocation checking and fastest port departure schedules
  • Official commercial quotation including EN 10204 3.1 MTC sample and seaworthy packing plan

Engineering Procurement Specification Intake

Fill specs below. WhatsApp: +8615688862221

Select FilePDF, DWG, XLSX, ZIP up to 10MB

Quick Inquiry & Discount Channel

Drop the key specs. We reply within 2 business hours, or the next business day after hours. Volume discount application supported.

Select FilePDF, DWG, XLSX, ZIP up to 10MB