Challenge
A stockist needed mixed OD ERW pipe for water and light structural use, with plain/bevel end notes, bundle tagging, and documents that procurement could reuse for customs—without overstating class-society approvals.
Challenge
A stockist needed mixed OD ERW pipe for water and light structural use, with plain/bevel end notes, bundle tagging, and documents that procurement could reuse for customs—without overstating class-society approvals.
Solution
Export desk quoted from mill-aligned ERW sizes (OD × WT × length). Packing used steel strapping and end caps; MTC EN 10204 3.1 referenced heat identity. Lead time followed the 7–21 working-day production window after confirmation, with port handoff at Tianjin.
Result
One full container delivered Tianjin → Mombasa with clear bundle marks and heat-linked MTC. Stockist placed a reorder using the same OD matrix and packing notes.
Send grade, size, quantity, and destination port. Owned mill + export desk will outline MTC and packing path.